Major Procedure:
- LOI/ICPO and BCL submitted by the buyer as the first step.
- FCO/Contract provided by the seller and the buyer signs it and send it back to the seller, then banking is set up.
- Payment made by the buyer as required per Contract term and POP is against POF.
- Upon receipt of payment, the seller will start loading and make the shipment within 45 days.
Documents required to process your order﹕ Two Things to move forward with:
- LOI [ Download ]
- BCL [ Download ] or RWA [ Download ]
Payment: [ Either One or Both depending on what commodity you purchase, term can’t be changed. ]
- Irrevocable & transferrable L/C at sight
- Unconditional & Transferrable BG/SBLC [ Download ]
Copper
- Copper Cathode Plates [ View ]
- Copper Scrap
Fuels
- Diesel D2
- Jet Fuel
- Mazut M100
Others
- Alloy Scra
- HMS 1 & 2
- Iron Ore
- Siberian Coal
- Urea [ View ]
- Used Rail